Flathead Lake Biological Station (2016-present) |
Project: Wastewater System Evaluation
Location: Yellow Bay on Flathead Lake, MT
Description:
- Planning, design, & construction of new wastewater treatment plant
- Upgrade Yellow Bay State Park collection system and lift station
|
|
|
Ptarmigan Village Homeowners Association (2005 & 2016) |
Project: Ptarmigan Village Wastewater System Assessment
Location: Whitefish, MT
Description:
- Overall assessment of the Village’s wastewater treatment & disposal system. Unit process evaluation and capacity analysis
- Alternatives analysis and cost estimates
- Regulatory impacts evaluation
- Groundwater permitting negotiations with MDEQ
|
|
|
City of Missoula (2016-present) |
Project: BioSolids & Green Waste Composting
Location: Missoula, MT
Description:
- Improvements to recently-acquired composting facility
- Helped City purchase a new mixer, tub grinder and screen
- Built a 12-bunker aerated static pile composting plant with positive aeration
- Placement of new facility on concrete surface for protection of groundwater and the Clark Fork
|
|
|
City of Missoula (2020-present) |
Project: Poplars and Water Re-Use
Location: Missoula, MT
Description:
- Irrigation of poplars with treated wastewater since 2014
- Planning for harvest of 36,000 hybrid poplars
- Irrigation of land with effluent, intend to re-purpose to another form of agricultural production
- Assisting with harvest/disposal of poplar biomass
- Analyzing what agricultural practices will provide the most benefit to City and surrounding environment
|
|
|
City of Whitefish (2000-present) |
Project: Wastewater Treatment Plan Improvements
Location: Whitefish, MT
Description:
- New SBR treatment planning, design, & construction management
- New advanced wastewater facilities and headworks
- Flocculating clarifier dome insulation
- Pretreatment facilities with perforated screen biofilter for odor control
- Long-term wastewater handling, solids dewatering basin and storage tank
- River lakes wastewater forcemain
- Discharge permit negotiation and preparation of compliance plan
- Grant writing & administration
Completed construction under a teaming agreement with Robert Peccia & Associates of the $23M Aerated Granular Sludge treatment facility in November 2021 - proceeding through startup and performance testing in 2022-23. |
|
|
Big Mountain County Sewer District (2018-present) |
Project: I & I Mitigation
Location: Big Mountain, MT
Description:
- Conducted an Infiltration and Inflow (I&I) evaluation
- Identified a number of possible sources for clear water inputs to the District’s sewer system
- Work to minimize I&I was completed in 2022 with numerous manholes being sealed
|
|
|
Town of Alberton |
Project: Disinfection & Controls (2017-2021)
Location: Alberton, MT
Description:
- Implemented a telemetry control system that automatically ran the well pump when demand exceeded supply
- Added flow monitoring, safe & effective disinfection to both sources
- Replaced vital infrastructure to enhance system dependability
|
|
Project: Distribution, Storage, Metering, New Supply (2017-present)
Location: Alberton, MT
Description:
- Began designing a $3.7M project in 2022 to address all the Town’s remaining drinking water system issues
|
|
|
Montana State Hospital Campus (2008 – 2018) |
Project: Water, Wastewater, Geothermal Drain System Improvements Project(s)
Location: Warm Springs, MT
Description:
- Wastewater system planning
- Replace water distribution mains with road paving
- I&I mitigation project including CIPP sewer rehabilitation, sewer replacement, geothermal drain system, new discharge manhole
- New greenhouse with radiant heat floor
- Water distribution improvements and directional drilling under RxR tracks
- Prepared utilities master plan
|
|
|
Montana State Hospital Wastewater Treatment Facility (2019-Present) |
Project: Upgrade Wastewater System
Location: Warm Springs, MT
Description:
- New lift station
- New rotary screen house in a precast concrete building
- Three new aerated lagoons
- New polishing reactor
- New ultraviolet disinfection and blowers housed in a precast concrete building
- New non-potable water system
- New outfall line
|
|
|
Montana State Hospital Water System (2019-2021) |
Project: MSH Backup Water System
Location: Warm Springs, MT
Description:
- Rehabilitation of the existing well – airbursting and casing brushing
- New 20’x20’ pumphouse with a roof hatch for accessing the well
- New piping allowing isolation between the irrigation & potable water systems
- New ultraviolet disinfection equipment with controls
- New well pump controls
- New double check valve assembly with a water meter and pressure transducer
- New gravel parking lot and access road
|
|
|
WATCH Building (2019-2020) |
Project: WATCH Building – Entry Sidewalk Replacement
Location: Warm Springs, MT
Description:
- Demolition of existing failing concrete infrastructure, landscaping, & fencing
- Replacement of existing pedestrian rated concrete sidewalk entrance
- New vehicular concrete driveway
- Landscaping
|
|
|
Park City County Water & Sewer District (2004-present) |
Project: Wastewater System Improvements
Location: Park City, MT
Description:
- Biosolids removal and permitting
- Installed a new 3-cell aerated lagoon treatment system with treatment building, UV disinfection
- Installed a new submersible lift station
- Discharge permit negotiation
- Installed an access road and bridge
- Rehabilitated sewer mains
- Grant writing and administration
- Water system PER
|
|
|
City of Polson (2009-2015) |
Project: Water System Improvements Project
Location: Polson, MT
Description:
- Design and oversee construction of over one mile of watermain replacement in the downtown area
- Design and oversee construction of two – 500,000 gallon concrete water storage tanks, rehabilitation of one existing 500,000 gallon steel water storage tank. System telemetry & automation
- Capital improvements plan
- Grant writing & administration
- Water system PER
|
|
|
Montana Law Enforcement Academy (2014-2015) |
Project: Water System Improvements Project
Location: Helena, MT
Description:
- New Well – siting, drilling, development, testing, production
- Storage tank aeration system for mixing
- Disinfection and controls in new building
- Water system PER
|
|
|
White Sulphur Springs (2013-2014) |
Project: Wastewater Improvements
Location: White Sulphur Springs, MT
Description:
- Design and construction management of sewer system rehabilitation & replacement project
- Grant writing & administration
- Wastewater system PER
|
|
|
City of Helena (2014) |
Project: Helena Centennial Trail
Location: Helena, MT
Description:
- Installation of approximately 4,570 lineal feet of paved, shared use path with solar lights, sidewalks, benches, trash receptacles, pavement markings, ADA features, etc.
- Landscaping approximately 2 acres of trail corridor
- Installation of an automatic irrigation system covering approximately 1.1 acres
- Stormwater drainage and retention improvements
- CTEP Funding administration and compliance
|
|
|
City of Helena and Lewis & Clark County (2009-2011) |
Project: : West Side Infrastructure Study, North Valley Infrastructure Study, Eastside Water Study
Location: Helena, MT
Description:
- Evaluated existing infrastructure in the study areas including, water, sewer and storm drain utilities for future utilization. Evaluated land uses and growth trends
|
|
|
Town of Kevin (2010-2013) |
Project: Water System Improvements
Location: Kevin, MT
Description:
- Installation of over 3 miles of water main, including water meters, curb stops, and air relief valves
- Rehabilitation and or replacement of existing spring collection structures and well pump houses
- Installation of a 300,000 gallon steel water storage tank and a chlorination building
- Grant writing & administration
- Water system PER
|
|
|
Elk Meadows Ranchettes Water and Sewer District (2008-2014) |
Project: Water System Improvements
Location: Huson, MT
Description:
- Expanded existing storage tank to 200,000 gallons and installed over 1.5 miles of water mains.
- Oversaw construction of a new addition to the existing pump house, installation of corrosion control treatment system plus disinfection
- New well and controls
- Grant writing & administration
- Water system PER
|
|
|
Town of Superior (2006-2009) |
Project: Water System Improvements
Location: Superior, MT
Description:
- Planning, design, and construction management of over 1.5 miles of watermain.
- Boring 247 lineal feet under MRL/BNSF Railroad and Highway 257
- Soil testing and remediation for arsenic and lead
- Grant writing & administration
- Water system PER
|
|
Project: CTEP Sidewalk Project (2005)
Location: Superior, MT
Description:
- Planning, design and construction management of downtown CTEP sidewalk project
|
|
Project: Wastewater Treatment Plant Improvements (2004)
Location: Superior, MT
Description:
- Planning, design and construction management of replacement of 3 wastewater lift stations, upgrades to the control and alarm system, and installation of a new ultraviolet disinfection system
- Grant writing & administration
- Discharge permit negotiation and mixing zone evaluation
- Wastewater system PER
|
|
|
Town of Valier (2009-2011) |
Project: Water System Improvements
Location: Valier, MT
Description:
- Planning, design and construction oversight of installation of a 250,000 gallon elevated water storage tank
- Installation of approximately 7,600 lineal feet of water main including new water meters, curb stops, and trenchless boring under a highway crossing
|
|
|
City of Whitefish |
Project: Reservoir Road Water Line Replacement (2009)
Location: Whitefish, MT
Description:
- Planning, design and construction management
- Replaced 24” primary water main from water plant
- Grant writing & administration
|
|
Project: Texas Ave Water Line (2009)
Location: Whitefish, MT
Description:
- Project planning, design, construction management, grant administration for approximately 9,200 lineal feet of water main including trenchless installation underneath a rail yard and 4,000 feet of road reconstruction
- Grant writing & administration
- Water system PER
|
|
|
Goodan-Keil County Water District (2006-2008) |
Project: Water System Improvements
Location: West of Missoula, MT
Description:
- Planning, design & construction management of over 1 mile of water main including hydrants, valves & controls, manhole structures, and water meters.
- Installation of a 150,000 gallon concrete water storage tank
- Grant writing and administration
- Water system PER
|
|
|
Spring Meadow Water and Sewer District (2004-2007) |
Project: Water System Improvements
Location: Missoula, MT
Description:
- Planning, design & construction management of installation of 150,000 gallon glass-coated steel storage tank
- Replacement well, a control system, distribution main looping, and water service meters
- Grant writing & administration
- Water system PER
|
|
|
City of Helena (2004) |
Project: Secondary Digester Tank Rehabilitation, New Cover & Piping
Location: Helena, MT
Description:
- Concrete tank rehabilitation, new pilasters and interior coating
- New internal gas drawoff piping and gas scrubbing
- New floating cover and guide system
- Secondary sludge mixing and drawoff
|
|
|