projects

Flathead Lake Biological Station (2016-2017)

Project: Wastewater System Evaluation
Location: Yellow Bay on Flathead Lake, MT

Description:  

  • Planning, design, & construction of new wastewater treatment plant
  • Upgrade Yellow Bay State Park collection system and lift station
Ptarmigan Village Homeowners Association (2005 & 2016)

Project: Ptarmigan Village Wastewater System Assessment
Location: Whitefish, MT

Description:  

  • Overall assessment of the Village’s wastewater treatment & disposal system.  Unit process evaluation and capacity analysis
  • Alternatives analysis and cost estimates
  • Regulatory impacts evaluation
  • Groundwater permitting negotiations with MDEQ
City of Missoula (2016-present)

Project: Biosolids & Green Waste Management Project
Location: Missoula, MT

Description:  

  • Biosolids & Green Waste Management Study:  planning document providing guidance for purchase of private composting operation
  • Licensing & environmental permitting assistance
  • Transitional operating plan and cost estimate
  • Equipment procurement
  • Design of aerated static pile compost facility
City of Whitefish (2000-present)

Project: Wastewater Treatment Plan Improvements
Location: Whitefish, MT

Description:  

  • New SBR treatment planning, design, & construction management
  • New advanced wastewater facilities and headworks
  • Flocculating clarifier dome insulation
  • Pretreatment facilities with perforated screen biofilter for odor control
  • Long-term wastewater handling, solids dewatering basin and storage tank
  • River lakes wastewater forcemain
  • Discharge permit negotiation and preparation of compliance plan
  • Grant writing & administration 
Montana State Hospital Campus (2008 – present)

Project: Water, Wastewater, Geothermal Drain System Improvements Project(s)
Location: Warm Springs, MT

Description:  

  • Wastewater system planning
  • Replace water distribution mains with road paving
  • I&I mitigation project including CIPP sewer  rehabilitation, sewer replacement, geothermal drain system, new discharge manhole
  • New greenhouse
  • Water distribution improvements and directional drilling under RxR tracks
  • Prepared utilities master plan
Park City County Water & Sewer District (2004-present)

Project: Wastewater System Improvements
Location: Park City, MT

Description:  

  • Biosolids removal and permitting
  • Installed a new 3-cell aerated lagoon treatment system with treatment building, UV disinfection
  • Installed a new submersible lift station
  • Discharge permit negotiation
  • Installed an access road and bridge
  • Rehabilitated sewer mains
  • Grant writing and administration
  • Water system PER
City of Polson (2009-2015)

Project: Water System Improvements Project
Location: Polson, MT

Description:  

  • Design and oversee construction of over one mile of watermain replacement in the downtown area
  • Design and oversee construction of two – 500,000 gallon concrete water storage tanks, rehabilitation of one existing 500,000 gallon steel water storage tank. System telemetry & automation
  • Capital improvements plan
  • Grant writing & administration
  • Water system PER
Montana Law Enforcement Academy (2014-2015)

Project: Water System Improvements Project
Location: Helena, MT

Description:  

  • New Well – siting, drilling, development, testing, production
  • Storage tank aeration system for mixing
  • Disinfection and controls in new building
  • Water system PER
White Sulphur Springs (2013-2014)

Project: Wastewater Improvements
Location: White Sulphur Springs, MT

Description:  

  • Design and construction management of  sewer system rehabilitation & replacement project
  • Grant writing & administration
  • Wastewater system PER 
City of Helena (2014)

Project: Ten Mile Water Treatment Plant
Location: Helena, MT

Description:  

  • PER and DEQ compliance plan
  • Design of backwash recycle and beneficial reuse project
  • Irrigation design including piping distribution and valves
 
City of Helena (2014)

Project: Helena Centennial Trail
Location: Helena, MT

Description:  

  • Installation of approximately 4,570 lineal feet of paved, shared use path with solar lights, sidewalks, benches, trash receptacles, pavement markings, ADA features, etc.
  • Landscaping approximately 2 acres of trail corridor
  • Installation of an automatic irrigation system covering approximately 1.1 acres
  • Stormwater drainage and retention improvements
  • CTEP Funding administration and compliance
City of Helena and Lewis & Clark County (2009-2011)

Project: : West Side Infrastructure Study, North Valley Infrastructure Study, Eastside Water Study
Location: Helena, MT

Description:  

  • Evaluated existing infrastructure in the study areas including, water, sewer and storm drain utilities for future utilization. Evaluated land uses and growth trends
 
Town of Kevin (2010-2013)

Project: Water System Improvements
Location: Kevin, MT

Description:  

  • Installation of over 3 miles of water main, including water meters, curb stops, and air relief valves
  • Rehabilitation and or replacement of existing spring collection structures and well pump houses
  • Installation of a 300,000 gallon steel water storage tank and a chlorination building
  • Grant writing & administration 
  • Water system PER
Elk Meadows Ranchettes Water and Sewer District (2008-2014)

Project: Water System Improvements
Location: Huson, MT

Description:  

  • Expanded existing storage tank to 200,000 gallons and installed over 1.5 miles of water mains.
  • Oversaw construction of a new addition to the existing pump house, installation of  corrosion control treatment system plus disinfection
  • New well and controls
  • Grant writing & administration
  • Water system PER
Town of Superior (2006-2009)

Project: Water System Improvements
Location: Superior, MT

Description:  

  • Planning, design, and construction management of over 1.5 miles of watermain.
  • Boring 247 lineal feet under MRL/BNSF Railroad and Highway 257
  • Soil testing and remediation for arsenic and lead
  • Grant writing & administration
  • Water system PER 

Project: CTEP Sidewalk Project (2005)
Location: Superior, MT

Description:  

  • Planning, design and construction management of downtown CTEP sidewalk project
 

Project: Wastewater Treatment Plant Improvements (2004)
Location: Superior, MT

Description:  

  • Planning, design and construction management of replacement of 3 wastewater lift stations, upgrades to the control and alarm system, and installation of a new ultraviolet disinfection system
  • Grant writing & administration
  • Discharge permit negotiation and mixing zone evaluation
  • Wastewater system PER
 
Town of Valier (2009-2011)

Project: Water System Improvements
Location: Valier, MT

Description:  

  • Planning, design and construction oversight of installation of a 250,000 gallon elevated water storage tank
  • Installation of approximately 7,600 lineal feet of water main including new water meters, curb stops, and trenchless boring under a highway crossing
City of Whitefish

Project: Reservoir Road Water Line Replacement (2009)
Location: Whitefish, MT

Description:  

  • Planning, design and construction management
  • Replaced 24” primary water main from water plant
  • Grant writing & administration 

Project: Reservoir Road Water Line Replacement (2009)
Location: Whitefish, MT

Description:  

  • Project planning, design, construction management, grant administration for approximately 9,200 lineal feet of water main including trenchless installation underneath a rail yard and 4,000 feet of road reconstruction
  • Grant writing & administration
  • Water system PER
 
Goodan-Keil County Water District (2006-2008)

Project: Water System Improvements
Location: West of Missoula, MT

Description:  

  • Planning, design & construction management of over 1 mile of water main including hydrants, valves & controls, manhole structures, and water meters.
  • Installation of a 150,000 gallon concrete water storage tank
  • Grant writing and administration
  • Water system PER
Spring Meadow Water and Sewer District (2004-2007)

Project: Water System Improvements
Location: Missoula, MT

Description:  

  • Planning, design & construction management of installation of 150,000 gallon glass-coated steel storage tank
  • Replacement well, a control system, distribution main looping, and water service meters
  • Grant writing & administration
  • Water system PER
City of Helena (2004)

Project: Secondary Digester Tank Rehabilitation, New Cover & Piping
Location: Helena, MT

Description:  

  • Concrete tank rehabilitation, new pilasters and interior coating
  • New internal gas drawoff piping and gas scrubbing
  • New floating cover and guide system
  • Secondary sludge mixing and drawoff